Introduction of drainage equipment
hearing
*Reports from past industrial estates or the Ministry of the Environment
*Amount of wastewater per day
*Items contained in wastewater (heavy metals, dissolved substances, etc.)sampling
* Receive samples of wastewater scheduled for treatment (20 L / case)
lab test
*Mock tests will be conducted using the method recommended by our company.
Inspection agency
*Submit lab-tested samples to an inspection agency to check whether they meet industrial park standards or general land standards.
Design & Quotation
* If it is judged that the treatment is possible after looking at the results of the laboratory test, we will design the drainage system and prepare an estimate for it.
Remark
All expenses up to the above process are borne by us. No billing to the customer.
contract
Introduced pure water equipment
hearing
*Confirmation of usage of RO water
*Maximum usage per hour
*Confirmation of required electrical conductivity (EC)sampling
* Sampling city water
lab test
*Measure the TDS, electrical conductivity, and pH of the city water you received
Design & Quotation
* We will design and estimate equipment that satisfies the conditions at the time of hearing.
Remark
All expenses up to the above process are borne by us. No billing to the customer.
contract