Started fluoride wastewater treatment. (Two-stage processing automatic batch coagulation sedimentation system)

There was a request from the customer to use the Songkran holiday to newly install our drainage system from the existing drainage system, so we have installed the new drainage system as follows. Existing system Continuous coagulation-sedimentation  ➡ treated water ➡ Discharged outside the factory   *Existing drainage system Since it is a continuous system, it takes a long…

Wastewater Environmental Standards in Thailand

Environmental Standards at IEAT Jurisdiction Locations LAW IEAT Announce 1) pH  5.5-9.0 2) Temperature  <  45  °C 3) Color < 600  ADMI 4) Odor  Must not be disgusted 5) Total  Dissolved  Solids  or  TDS)  <  3,000 mg/l 6) Total  Suspended  Solids  <  200 mg/l 7) Biochemical  Oxygen  Demand (BOD) <  500 mg/l 8) Chemical  Oxygen …

On June 1, 2020, our company celebrated its 10th anniversary.

I received a phalaenopsis orchid as a gift from Maezawa Kogyo. Happy new year to all of you. Our company will celebrate its 10th anniversary on June 1st of this year. This is also your Thank you very much for your kind cooperation. Last year and 2019, we had 4 drainage facilities and RO (pure water)…

New Year’s greetings

Date: January 1st, 2020 Happy new year to all of you. Our company will celebrate its 10th anniversary on June 1st of this year. We would like to express our sincere gratitude to all of you for your cooperation. Last year and in 2019, we handled a total of 12 new projects, 4 for drainage…

Wastewater treatment cost simulation table

Cost simulation table A successful example of our company’s actual implementation in the 304 industrial park Monthly industrial waste cost (A) 375 tons x @1,000 THB/ton=375,000 THB *Industrial waste costs vary by region. Amount of water discharged per month (B) 15ton/day x 25 days=375 tons New wastewater treatment facility (C) 3,600,000 THB Running cost of…

I started using a clamp-on flow meter.

In order to use drainage facilities effectively, it is essential to I have a grasp of the flow rate. At our company, when designing a drainage system, we ask our customers We will ask you about the amount of water discharged per hour and the amount of water discharged per day. There are few cases where…

Introduction of new customers

Customer name: Mizuki Thailand Co., Ltd. Location: Hemaraj Eastern Seaboard Industrial Estate in Rayong Industry: Automotive parts Type of wastewater: Wastewater from production processes containing oil and domestic wastewater Flow rate: 24M3 per day Our facilities: Batch type Coagulation sedimentation system (UIsystem) 500L per batch Chemicals used: Aluminum sulfate (coagulant) Sodium hydroxide (neutralizer) Sulfuric acid…