Introduction of drainage equipment

Flow up to ordering
  • null

    hearing

    *Reports from past industrial estates or the Ministry of the Environment
    *Amount of wastewater per day
    *Items contained in wastewater (heavy metals, dissolved substances, etc.)

  • null

    sampling

    * Receive samples of wastewater scheduled for treatment (20 L / case)

  • null

    lab test

    *Mock tests will be conducted using the method recommended by our company.

  • null

    Inspection agency

    *Submit lab-tested samples to an inspection agency to check whether they meet industrial park standards or general land standards.

  • null

    Design & Quotation

    * If it is judged that the treatment is possible after looking at the results of the laboratory test, we will design the drainage system and prepare an estimate for it.

  • null

    Remark

    All expenses up to the above process are borne by us. No billing to the customer.

  • null

    contract

Introduced pure water equipment

Flow up to ordering
  • null

    hearing

    *Confirmation of usage of RO water
    *Maximum usage per hour
    *Confirmation of required electrical conductivity (EC)

  • null

    sampling

    * Sampling city water

  • null

    lab test

    *Measure the TDS, electrical conductivity, and pH of the city water you received

  • null

    Design & Quotation

    * We will design and estimate equipment that satisfies the conditions at the time of hearing.

  • null

    Remark

    All expenses up to the above process are borne by us. No billing to the customer.

  • null

    contract