Started fluoride wastewater treatment. (Two-stage processing automatic batch coagulation sedimentation system)

There was a request from the customer to use the Songkran holiday to newly install our drainage system from the existing drainage system, so we have installed the new drainage system as follows. Existing system Continuous coagulation-sedimentation  ➡ treated water ➡ Discharged outside the factory   *Existing drainage system Since it is a continuous system, it takes a long…