Drainage Equipment Performance Chart

U.I.Masters 排水設備実績表 作成日:June.04.2025 Serial # Customer Name Location 設置完了日 (検証日) 排水量 (M3/day) 処理 方法 有償 メンテ DM-001 Yanagawa Techno Forge (Thailand)Co.,Ltd. Eastern Seabord IE, Rayong May.04.2013 100 オイル吸着材 DM-002 Nissen Kohki Thai Co.,Ltd. TFD IE, Chachongsao Aug.16.2013 20 オイル吸着材 DM-003 K.D.Heat Technology (Thailand)Co.,Ltd. 304 IE,Prachinburi Sep.23.2013 100 オイル吸着材 DM-004 Yakult (Thailand) Co.,Ltd. Bang Pa-In,Ayutthaya Oct.04.2013…

RO & Water Softening Equipment Performance Chart

Date:June.04.2025 RO system (純水装置) #Seria Customer Name Location Installation Capacity Paid mainte RO-001 Thai Nikken Foods Amata City Rayong May.2012 3M3/Hr RO-002 StraPack Bangplee Feb.2013 0.5M3/Hr 〇 RO-003 Fukui Biyora Amata City Rayong June.2014 3M3/Hr 〇 RO-004 Ogusu Pington 2 Aug.28.2015 0.5M3/Hr RO-005 E&H Amata City Chonburi Oct.29.2015 1M3/Hr RO-006 FCC Amata City Chonburi Oct.26.2015…

Started fluoride wastewater treatment. (Two-stage processing automatic batch coagulation sedimentation system)

There was a request from the customer to use the Songkran holiday to newly install our drainage system from the existing drainage system, so we have installed the new drainage system as follows. Existing system Continuous coagulation-sedimentation  ➡ treated water ➡ Discharged outside the factory   *Existing drainage system Since it is a continuous system, it takes a long…

Wastewater Environmental Standards in Thailand

Environmental Standards at IEAT Jurisdiction Locations LAW IEAT Announce 1) pH  5.5-9.0 2) Temperature  <  45  °C 3) Color < 600  ADMI 4) Odor  Must not be disgusted 5) Total  Dissolved  Solids  or  TDS)  <  3,000 mg/l 6) Total  Suspended  Solids  <  200 mg/l 7) Biochemical  Oxygen  Demand (BOD) <  500 mg/l 8) Chemical  Oxygen …

On June 1, 2020, our company celebrated its 10th anniversary.

I received a phalaenopsis orchid as a gift from Maezawa Kogyo. Happy new year to all of you. Our company will celebrate its 10th anniversary on June 1st of this year. This is also your Thank you very much for your kind cooperation. Last year and 2019, we had 4 drainage facilities and RO (pure water)…

New Year’s greetings

Date: January 1st, 2020 Happy new year to all of you. Our company will celebrate its 10th anniversary on June 1st of this year. We would like to express our sincere gratitude to all of you for your cooperation. Last year and in 2019, we handled a total of 12 new projects, 4 for drainage…

Wastewater treatment cost simulation table

Cost simulation table A successful example of our company’s actual implementation in the 304 industrial park Monthly industrial waste cost (A) 375 tons x @1,000 THB/ton=375,000 THB *Industrial waste costs vary by region. Amount of water discharged per month (B) 15ton/day x 25 days=375 tons New wastewater treatment facility (C) 3,600,000 THB Running cost of…